|
|
|
Secugrid® in use. |
Secugrid® 180/20 R6 as base course reinforcement for the interstate A7 Exit Fuessen, Germany in the floating dam construction. The cover soil material was crushed 2 - 150 mm.
Click here for more details (PDF)
|
|
Installation of the composite product Combigrid® 30/30 Q1/151 GRK 3 between the subsoil and the bearing layer for the bus station Wellingholzhausen, Germany. With the cost effective installation three functions are fulfilled at once: separation, filtration and reinforcement.
Click here for more details (PDF)
|
|


 |
|